Fig xA Trade off representation

Fig. 10. Trade-off representation of OCI and the percentage of operating time of Ntot,eNtot,e violations for a range of c values from 0.5 to 4 with increments of 0.5 (points marked with crosses) and e values = 7 (solid line), 6 (dash-doted line), 5.5 (doted line), 5 (dashed line).Figure optionsDownload full-size imageDownload as PowerPoint slide
Fig. 11. QrinQrin, NHeNHe and Ntot,eNtot,e 6XHis form day 7 to day 14 with default PI controllers (dash-doted line) and with the control for NHeNHe violations removal (solid line).Figure optionsDownload full-size imageDownload as PowerPoint slide
Table 6.
Results with default PI controllers and with control for NHeNHe violations removal for dry, rain and storm influents.Default PI controllersControl for NHeNHe violations removal%% of gap junctions reductionDry influentEQI (kg pollutants/d)6115.635760.955.8OCI16381.9316323.480.4Ntot,eNtot,e violations (%% of operating time)17.5615.6211.04NHeNHe violations (%% of operating time)17.260100Rain influentEQI (kg pollutants/d)8174.987814.984.4OCI15984.8517463.78−9.2Ntot,eNtot,e violations (%% of operating time)10.8613.84−27.4NHeNHe violations (%% of operating time)27.080100Storm influentEQI (kg pollutants/d)7211.486903.024.3OCI17253.7517582.3−1.9Ntot,eNtot,e violations (%% of operating time)15.0322.32−48.5NHeNHe violations (%% of operating time)26.790100Full-size tableTable optionsView in workspaceDownload as CSV