Biomass energy production As one of the

Final results of the technical evaluation.Full-size table
In the following, only critical aspects connected to the treatment of WAS with thermal pre-treatment followed by TAD are discussed. Firstly, it AZD4547 must be noted that it was assumed that the biological reactor of the existing WWTP was able to treat the extra loads returned from the sludge line, but this aspect should be better investigated in any real application.