State space models with a

The upper figures show the relative difference when considering the costs as obtained directly from the MO. The lower part of the figure contains the same results, but shows the costs after re-evaluation with the unit commitment model. The box plot shows four quartiles in the data, with the middle line being the median of the values. . (a) Total operational system cost, as obtained from the MO (TCMO), compared to the total operational cost obtained with the IM (TCIM); (b) Total cost for building owners, as obtained from the resolution MO (ECMO), compared to the corresponding cost obtained with the IM (ECIM); (c) Total operational system cost, re-evaluated with the UC & ED, considering the demand from the electric heating systems as obtained from the MO (TCMOR), comparedto the total operational cost obtained directly with the IM (TCIMR); (d) Total cost for building owners, re-evaluated with the UC & ED, considering the demand from the electric heating systems as obtained from the MO (ECMOR), compared to the corresponding operational cost 'AZD8931' obtained directly with the IM (ECIMR).Figure optionsDownload full-size imageDownload as PowerPoint slide