An updated groundwater flow and transport model of the

The construction of an brachiopods open channel around the landfill to collect its leachate was also proposed by the activities of the launched project (Ideon, 2007, Metsur, 2005 and Ramboll, 2007). A vertical barrier consisting of compacted peat arranged into the loose deposits was designed to be built along the outer bank of the channel to restrict the spreading of contaminated water.
3.2. Capping of the landfill
3.3.