power Plant


This part describes the assorted forms of Boilers: Fireplace tube boiler, Water tube boiler, Packaged boiler, Fluidized Mattress Combustion Boiler, Atmospheric Fluidized Bed Combustion Boiler, Pressurized Fluidized Bed Combustion Boiler, Circulating Fluidized Bed Combustion Boiler, Stoker Fired Boiler, Pulverized Gas Boiler, Waste Heat Boiler and Thermic Fluid Heater. In a Boiler gas is burnt to get heat power which is converted from chemical energy stored in a gas. Water comes Steam Boiler Repair to water wall from Boiler drum, and circulated back to drum after absorbing heat. During circulation of water in tubes, steam is generated and collected on the upper part of the Drum. Ash which is produced within the Boiler on account of combustion of solid fuel is collected at Boiler bottom and also in Economizer, Air Pre-heater and ESP. So by charging steam in Deaerator water temperature will increase and soluble gases in condensate departs.

This results in lower in drum stage and Feed Management valve will open extra to compensate the Drum degree to Regular water degree, which ends up in overloading of Boiler Feed pump. If tube has failed inside boiler then hissing sound comes and it can be noticed from exterior. At the time of Islanding, Generator will comply with the load related on this Unit and the Governing Control Valves would close according to load and permit the steam to move via Turbine. The excess amount of steam will remain in Boiler which will increase the Drum pressure.

After guaranteeing the reason, shut the start-up vent and dump the surplus steam in Condenser. If warmth provide to Boiler can be increased all of a sudden with an enormous quantity then it affects the drum level and it swells. When stand-by Boiler feed water pump has began with operating Boiler feed water pump, then Drum degree increases as a result of at that opening in Boiler feed Control valve when feed water pressure increases, more feed water flows to drum as a consequence of that opening of management valve and leads to improve in drum level. This case normally happens during scheduled Equipment change over of Boiler feed water pump.

If unit got here to Island mode then the Generator will comply with the load which is connected to it and load set point at Generator increases than the steam era in Boiler. When steam pressure decreases then scale back the Generator set level accordingly to avoid TG journey at important steam strain low and ensure whether or not tube has failed or not. If tube has failed then Boiler shut down needs to be taken to replace the failed tube with a new tube. This case happens when flue fuel temperature at Submit Combustion Chamber reaches 10500 C. Flue fuel move to Boiler minimize off when ID damper closes.

As we cannot change the load set level of Generator by putting decrease set level value, Load on the Generator must be lowered by slicing off the load linked to it. Choose the less vital load linked to Generator and lower off it as shortly as potential otherwise the unit will undergo from Black out situation as a result of TG journey at Primary steam pressure low and Grid energy is unavailable.