Calibrating detailed building energy simulation programs with measured data--Part II: application to three case study office buildings (RP-1051).

Even if you have a lot of other priorities for instance, sports, extracurricular activities, etc., still you need to complete a senior project to graduate successfully

The companion paper proposed a general methodology of calibratingdetailed building energy simulation programs to performance data thatalso allowed the determination of the prediction uncertainty of intendedenergy conservation measures. The methodology strived to provide ameasure of scientific rigor to the process of calibration as a whole,which has remained an art form with no clear consensus guidelines despite being followed by numerous professionals for several decades.The proposed methodology, while providing a clear